Developed and maintained by ProWorkstack · Development and review process
Track the document checks you have finished, keep critical gaps visible, and estimate the time and cost of the remaining review.
Developed and reviewed by the ProWorkstack editorial team.
Your results
Enter your inputs and select Calculate.
How this calculator works
Remaining items = max(applicable items − min(completed items, applicable items), 0). Completion percentage = completed applicable items ÷ positive applicable items × 100. Review value = remaining items × minutes per item ÷ 60 × hourly reviewer cost.Worked example
Forty applicable items with 28 complete leave 12. Completion is 70%. At 15 minutes per item and 60 per hour, remaining review effort is three hours valued at 180. Four critical open items are shown separately, without changing the percentage.Assumptions
Use the checklist approved for this document. Count an item as complete only when its required evidence has been reviewed. The example treats remaining items as equally time-consuming. The defaults are examples, not benchmarks.
Interpreting your results
A checklist percentage does not establish legal compliance or document quality. No document is uploaded or inspected. Required items, evidence standards and critical designations must come from the responsible reviewer.Calculation formulas
- remaining
MAX(required-MIN(complete,required),0)- Checklist completion
SAFE_DIV(MIN(complete,required),required,0)*100- Items still to review
remaining- Unfinished critical items
MIN(critical,remaining)- Estimated cost to finish the review
remaining*minutes/60*rate
Frequently asked questions
What counts as a completed document check?
Remove genuinely inapplicable checks with a recorded reason rather than marking them complete. A completed item needs the evidence your reviewer requires; the calculator cannot decide whether a document satisfies that evidence.
How should I interpret the main result?
This is the share of applicable checks completed, not a score for legal compliance or document quality.