Developed and maintained by ProWorkstack · Development and review process
Compare ongoing technical debt maintenance effort with the cost of fixing recurring problems, including captured time value and simple payback.
Developed and reviewed by the ProWorkstack editorial team.
Your results
Enter your inputs and select Calculate.
How this calculator works
Hours saved = current maintenance hours − expected post-fixes hours. Ongoing captured net benefit = hours saved × total hourly cost × capture fraction − added monthly platform costs. One-time budget = fixes hours × total hourly cost + other one-time costs. First-year benefit = 12 × ongoing benefit − one-time budget. Simple payback uses positive ongoing net benefit.Worked example
Maintenance falls from 80 to 30 hours per month, releasing 50. At 75 per hour and 60% capture, that represents 2,250 monthly value. Subtract 200 ongoing costs for 2,050 net benefit. The repair project takes 120 hours at 75 plus 1,000 other costs: 10,000 total. First-year benefit is 14,600; simple payback is 4.88 months.Assumptions
Measure maintenance work attributable to the problems being fixed. Keep the repair project separate from ongoing maintenance. Only value saved hours that can reduce costs or support useful work; benefits are assumed constant from the start. The defaults are worked examples, not benchmarks.
Interpreting your results
This is an effort-and-cost scenario, not an interest-rate forecast or a codebase audit. Time freed up is not automatically cash saved. It excludes risk reduction, future revenue, discounting and implementation ramp-up. Benefits start immediately in the simple first-year model; use a separate monthly schedule if rollout is gradual.Calculation formulas
- released
hours_now-hours_after- benefit
released*rate*capture/100-extra_monthly- setup
project_hours*rate+project_cash- year_net
benefit*12-setup- First-year value after repair costs
year_net- Monthly value after added costs
benefit- Maintenance hours saved
released- One-time repair budget
setup- Time to recover repair costs
SAFE_DIV(setup,benefit,0)- Value of current maintenance time
hours_now*rate
Frequently asked questions
Can I use a different currency?
Yes. Choose your currency and enter every monetary amount in that currency. No exchange-rate conversion is performed.
What should I check before relying on this estimate?
Measure maintenance work attributable to the problems being fixed. Keep the repair project separate from ongoing maintenance. Only value saved hours that can reduce costs or support useful work; benefits are assumed constant from the start.
Maintained by ProWorkstack editorial team · Last reviewed: 2026-10-06 · Development and review process