Summarize your manual case-brief structure review and budget revisions for incomplete checklist items.
Build checks from the assignment
Examples can include a clearly stated decision, relevant evidence, alternatives and a supported recommendation, but the assigned rubric takes priority. Mark a check met only after locating the supporting passage.
How the calculation works
Missing checks = applicable checks − capped completed checks. Completion percentage = completed ÷ positive applicable checks × 100. Revision hours = missing checks × minutes per check ÷ 60. Shortfall = max(revision hours − available hours, 0).
A worked example
Eight of 12 checks gives 66.67% completion and four missing checks. At 20 minutes per missing check, revisions take 1.33 hours. With two hours available there is no estimated time shortfall.
Revise the argument before formatting
A missing decision criterion may require more thinking than a missing heading. Split substantial analytical work from small formatting fixes when one average revision time stops being useful. Ask a reviewer to test the reasoning separately.
What the result leaves out
No brief text is inspected and no HBR affiliation, grading or logical correctness is implied. Use your actual assignment rubric. A completed checklist does not ensure a sound argument or original analysis.
Open the calculator with your own figures →
The defaults are constructed examples, not market benchmarks. Keep a copy of the records and assumptions behind your result so you can repeat the comparison after the next reporting period.
Related calculators and guides
- CPA Practice Scores: Combine Questions and Simulations · Open its calculator
- CFA Mock Results: Compare Your Score with a Practice Target · Open its calculator
More study planning calculators · All Business Guides · How the calculations work
Prepared by ProWorkstack. Our editorial standards explain how we handle examples, limitations and corrections.